28 days in 8 minutes. The final video for the Artists’ Backyard_Phase 1.

20 Aug
Advertisements

Phase 1 COMPLETE!! All 22 days in less than 3 minutes.

7 Aug

Day 22

2 Aug

Day 22- Phase 1- Artists’ Backyard- Only odds and ends left.  Water infiltration measurement device installed in between the oaks. Concrete poured to transition Phase 1 walk to the existing walk in preparation for Phase 2 in 2012!

Thank you to University Housing and the Office of Sustainability for featuring our project…

31 Jul

http://ncsu.edu/housing/article.php?id=264

DAY 15

25 Jul

This slideshow requires JavaScript.

 

Day 15_Phase 1_Artists’ Backyard- Flat work continues on top right. Brick workers space bricks and work hard to complete the walkway. Drainage installed in bmp’s.

DAY 14

23 Jul

This slideshow requires JavaScript.

Day 14_Phase 1_Artists’ Backyard- The site starts to come together with the brick installation. Clean up of concrete frames continues. Repurposed flagstone is being layed in the top right corner and bottom right off screen.

DAY 13

22 Jul

This slideshow requires JavaScript.

 

Day 13_Phase 1_Artists’ Backyard- Lots of little things get accomplished today. Removal of concrete frames. Walkway prep. Grate cutting and prep. General clean-up.