Archive | 9:08 pm

Day 22

2 Aug

Day 22- Phase 1- Artists’ Backyard- Only odds and ends left.  Water infiltration measurement device installed in between the oaks. Concrete poured to transition Phase 1 walk to the existing walk in preparation for Phase 2 in 2012!

Advertisements