Archive | August, 2011

28 days in 8 minutes. The final video for the Artists’ Backyard_Phase 1.

20 Aug
Advertisements

Phase 1 COMPLETE!! All 22 days in less than 3 minutes.

7 Aug

Day 22

2 Aug

Day 22- Phase 1- Artists’ Backyard- Only odds and ends left.  Water infiltration measurement device installed in between the oaks. Concrete poured to transition Phase 1 walk to the existing walk in preparation for Phase 2 in 2012!

DAY 21…a few more from a busy day!

1 Aug

This slideshow requires JavaScript.

DAY 21

1 Aug

This slideshow requires JavaScript.

Day 21- Phase 1- Artists’ Backyard- The crew puts the finishing touches on the project. Installing grates that cross the walkway atop the runnels and crossing items off the punch list.

Watering Schedule

1 Aug